If enabled, tasks can be completed not only in the Task view but also directly from lists, as long as the task does not have any mandatory form fields.
If you have several tasks of the same type you can complete up to 10 tasks at the same time.
How to Complete tasks in lists
1. Select the task(s) that you want to complete. If you choose multiple ones, note that all the selected tasks must be in the same step and in the same process version
2. Click on the Task actions drop-down in the upper left corner of the list, and select Complete tasks.
Assign role and action comments when completing tasks in lists
If the task(s) completed from a list is configured with either assign role or mandatory action comments these two settings will show up in the same way they do in the Task View to be performed before the task is completed.
When to Complete tasks in lists
Complete tasks in lists when you have multiple instances of the same task, that is not in the need for more information for completion, to streamline your work.
Why can I not complete tasks from List view
There are several reasons why you are not able to complete tasks from lists:
- If the selected tasks are in different process versions the Complete tasks button will not be shown.
- If the task includes forms with mandatory fields the task can not be completed from the list and a error message will be shown.
- If you can not complete any tasks from the list view, it is because this feature was not enabled when the list was configured.